Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4914696 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Deposit Kilimanoor Gramapanchayath-permanant Disconnection Of Public Taps In Kilimanoor Gramapanchayath Pipeline Work |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 31 Jul, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 2367.00 |
| Estimated Cost | 94674.00 |
| City | Attingal |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Working Charges | ||
| 2 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.000 | cum |
| 3 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 2.300 | cum |
| 4 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.300 | cum |
| 5 | 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 35.000 | Disconnection |
7 Days Left