Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026890 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Type A 02 Nos And Type B 04 Nos Residential Quarter For Vishesh Abhisuchana Vibhag At District |
| Last Date For Submission | 28th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 950000.00 |
| Estimated Cost | 15000000.00 |
| City | Auraiya |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil, backfilling and disposal of surplus excavated soil as directed, within a lead of 50 m | 419.00 | Cum |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 82.00 | Cum |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not excluding 8km from the site of work and including watering dressing etc. rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. | 31.00 | Cum |
| 4 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 stone ballast 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. | 63.00 | Cum |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4)Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 5 liters/sqm | 215.00 | Sqm |
7 Days Left