Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Ministry Of Road Transport And Highways
Tender ID4530831
Organisation NameMinistry Of Road Transport And Highways
Tender BriefCorrigendum : Construction Of Diversion (length 685m) Due To Damaged H.l. Bridge (9x25m) Over Batane River In Km. 141.00 Of Nh-139 For The Year 2026-27.
Last Date For Submission17th Aug, 2026
Opening Date18 Aug, 2026
Cost
Document Cost10000.00
EMD920000.00
Estimated Cost45977651.00
Location
CityAurangabad(BH)
StateBihar

Register to see full details

BOQ Items
#ItemQtyUnits
1Case-I Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction. (Approach Hariharganj Side)1875Cum.
2Case-II Compacting Original ground supporting embankment Loosening, leveling and compacting orinal ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for emabakment construction. (Approach Aurangabad Side)450.00Cum.
3Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.2,025.00Cum.
4Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (I) B(i) Mechanical Means( Depth upto 3 m )539.00Cum.
5Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.44.00Cum.
17th Aug, 2026

16 Days Left