| Tender ID | 4530831 |
|---|---|
| Organisation Name | Ministry Of Road Transport And Highways |
| Tender Brief | Corrigendum : Construction Of Diversion (length 685m) Due To Damaged H.l. Bridge (9x25m) Over Batane River In Km. 141.00 Of Nh-139 For The Year 2026-27. |
| Last Date For Submission | 17th Aug, 2026 |
| Opening Date | 18 Aug, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 920000.00 |
| Estimated Cost | 45977651.00 |
| City | Aurangabad(BH) |
|---|---|
| State | Bihar |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Case-I Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction. (Approach Hariharganj Side) | 1875 | Cum. |
| 2 | Case-II Compacting Original ground supporting embankment Loosening, leveling and compacting orinal ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for emabakment construction. (Approach Aurangabad Side) | 450.00 | Cum. |
| 3 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 2,025.00 | Cum. |
| 4 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (I) B(i) Mechanical Means( Depth upto 3 m ) | 539.00 | Cum. |
| 5 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 44.00 | Cum. |