Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026588 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Proposed Beautification Horticulture Work Of Road Divider From Central Naka To Madani Chouk Prabhag No.13 Csmc |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 29 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 4595.00 |
| Estimated Cost | 459467.00 |
| City | Aurangabad-MH |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Removing grass, gazer grass and disposing off out of building premises including Labour charges for making clean the ground by shovel and phavaras etc. complete. As per Parks And Garden DSR 2022-2023 Items of garden work Sr.No.1 & 2 (Labour Charges = 7.00 / Sqm + Disposing off of Material Rate is 6.00/Sqm =Rs.13.00/Sqm) | 318.00 | Sqm. |
| 2 | Excavation for planting lawn/ shrub/ flower bed/ hedges/ edges/ canna bed in earth, soil of all types, soft murum, including removing the excavated material up to a distance of 50 mtrs. for a depth of 30 cms. As per Parks And Garden DSR 2022-2023 Items of garden work sr no.3 | 318.00 | Sqm. |
| 3 | Supplying on site fresh Garden soil (i. e. 3 part soil ) (free from stones rubbish like dried grass roots, other such materials) for excavation area of depth of 30 cms ( consolidated thickness).As per Parks & Garden DSR 2022-2023 Items of garden work sr no.37a | 318.00 | Sqm. |
| 4 | Excavation pit size 0.60 x 0.60 x 0.60 m for planting small & medium ornamental plants/ large flowering/ shady trees (plant height 1 to 2 mtr.)/ palm varieties upto height 1 to 2 mtrs. in earth, soil of all types, soft murum, including removing the excavated & unwanted material up to a required distance of 50 mtrs.As per Parks And Garden DSR 2022-2023 Items of garden work sr no.11 | 300.00 | Nos. |
| 5 | Excavation pit size 0.45 x 0.45 x 0.45 m for planting small & medium ornamental plants/ large flowering/ shady trees (plant height 1 to 2 mtr.)/ palm varieties upto height 1 to 2 mtrs. in earth, soil of all types, soft murum, including removing the excavated & unwanted material up to a required distance of 50 mtrs.As per Parks And Garden DSR 2022-2023 Items of garden work sr no.10 | 400.00 | Nos. |
6 Days Left