Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4558133 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Macadamization Of Ir Dadsara Incl Dadsara Lariyar. |
| Last Date For Submission | 29th Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 1600.00 |
|---|---|
| EMD | 116500.00 |
| Estimated Cost | 5825000.00 |
| City | Awantipora |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Engagement of Excavator (JCB) for removing of unhygenic material complete i/c disposal as directed by EIC.Quantities anticipated, however, payment shall be made as per actual certified by AEE. | 15.000 | HR |
| 2 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 326.580 | cum |
| 3 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). | 1095.000 | Sqm |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade-VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. on WBM/WMM @ 0.75 kg/sqm | 4354.450 | sqm |
| 5 | Providing and applying tack coat using hot straight run bitumen of grade-VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. on BT surface @ 0.50 kg/sqm | 1095.000 | sqm |
8 Days Left