Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123926 |
|---|---|
| Organisation Name | State Urban Development Agency |
| Tender Brief | In Nagar Panchayat Maa Kamakhya, In Koyli Ka Purwa Of Ganeshpur Ward, From The Interlocking Road To Dineshs House Via Nandkumar Ravindra Kumar Parshuram Shambhus House And From Barsaatis House To Ram Karans House Via Vijay Kumars House, Constru |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 5360.00 |
|---|---|
| EMD | 454500.00 |
| Estimated Cost | 4543321.00 |
| City | Ayodhya |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. Asper S.I.No.-253. | 395.14 | CuM |
| 2 | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate | 119.36 | CuM |
| 3 | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 8;4;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-275 | 59.68 | CuM |
| 4 | Supply of 80 mm thick Rubber mould zig zag mechanically compressed inter locking cement concrete pavers block manufatured by high pressure and controlled by vibration making havuing plant dimention 200* and also including laying of interl;ocking otiles including leveling and desssing of surface in reguired level and slope filling joints with F/sand over previously laid WBM surface with cushion of average 50mm thick F/savd including cost of materials & labours T & P etc required for proper completion of the work directed by E/I . | 153.52 | CuM |
| 5 | Cement Concrete in 1:2:4 in cement, coarse sand and 20mm guage stoe ballast in foundation and floor including supply of all materials, labours, T&P,etc. required for proper completion of the work.As per SI.no-279.(b) | 215.55 | CuM |
20 Days Left