Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4241940 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Under District Amethi, Construction Of Community Hall In Village Baheria Majre Satanpurwa, Development Block Singhpur, Tehsil Tiloi District, Amethi, Lot No 1 |
| Last Date For Submission | 20th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 95500.00 |
| Estimated Cost | 4775000.00 |
| City | Ayodhya |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Work | ||
| 2 | Earth work in exacavation in foundations in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 mt. & including filling, watering and ramming of excavated earth into the trenches or into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 mt. from the foundation trenches. | 99.21 | Cum |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone ballast 40 mm nominal size) and curing complete, including cost of form- work, in foundation. | 17.91 | Cum |
| 4 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete. | 120.71 | Cum |
| 5 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Foundation excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. | 23.31 | Cum |
8 Days Left