Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3710356 |
|---|---|
| Organisation Name | Pashchimanchal Vidyut Vitran Nigam Limited |
| Tender Brief | Corrigendum : Fault Location Pin Point Work Under Edd-i Baraut |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 3500.00 |
| Estimated Cost | 350000.00 |
| City | Baghpat |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | To locate the 33 KV and 11KV fault & digging of trench with the help of road cutter/digging machine/tractor etc. (ideal size of trench 4 m length & 1.5 m width) & Road restoration after rectification of fault as per Norms. | 20 | Nos. |
| 2 | Providing, fixing and commissioning of 33 KV Straight through Box with jointer per 33KV Cable joint for filling and complete connection/work in all respect. (33 KV 3x300/400/185 Sq.mm./as per site requirement straight through box of Raychem/3M/ Denson make shall be provided by the contractor). | 3 | Nos. |
| 3 | Providing, fixing and commissioning of 33 KV Outdoor/Indoor Termination Jointing Kit with jointer per 33 KV Cable joint for filling and complete connection/work in all respect. (33 KV 3x300/400/185 Sq.mm./as per site requirement Outdoor/Indoor jointing Kit of Raychem/ 3M/ Denson make shall be provided by the contractor). | 4 | Nos. |
| 4 | Providing, fixing and commissioning of 11 KV Straight through box with jointer per 11KV Cable joint for filling and complete connection/work in all respect. (11 KV 3x185/240/300/120 Sq.mm./as per site requirement straight through box of Raychem/ 3M/ Denson make shall be provided by the contractor). | 3 | Nos. |
| 5 | Providing, fixing and commissioning of 11 KV Outdoor/Indoor Termination Jointing Kit with jointer per 11 KV Cable joint for filling and complete connection/work in all respect. (11 KV 3x185/240/300/120 Sq.mm./as per site requirement Outdoor/Indoor Termination jointing Kit of Raychem/ 3M/ Denson make shall be provided by the contractor). | 4 | Nos. |
4 Days Left