Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4115141 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Gram Panchayat Charaniya Kot Me Kali Road Dileep Gupta Ke Ghar Se Kali Mata Mandir, Nand Kumar Verma, Aaditya Ram Chauhan, Rakesh Mishra, Sanjay Mishra Ke Ghar Hote Huye Pakki Sadak Tak Inerlocking Nirman Karya-viseshwarganj_12 |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 2384.00 |
|---|---|
| EMD | 41400.00 |
| Estimated Cost | 0.00 |
| City | Bahraich |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | "E/W in Exavation in foundation in ordinary soil. As per SoR Ch-4.251. | 60.00 | M3 |
| 2 | Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | 105.19 | M3 |
| 3 | Granular Sub-base with well Graded Material (Table400.1) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 39.75 | M3 |
| 4 | Providing, laying, G-3 spreading and compacting stone aggregated of specific sizes (53 mm to 22.4 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth whee roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening / binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 As per MORD Sr. No.4.7(3) & Technical Specification Clauses 405. | 94.310 | M3 |
| 5 | Class M-150 B/W in 1:4 cement and Course sand mortar of 1.25 mm FM mortar in foundation and plinth including supply of all materials. As per SoR Ch-4.305 (b) | 62.10 | M3 |
1 Days Left