Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID5017255
Organisation NameWater Resources Department
Tender BriefBid 03-14 Of 2026-27 Constrcution Of New Rcc Double Vent Sluice Gate On Right Bank Of Occ R-iv A At Balarampur
Last Date For Submission31st Jul, 2026
Opening Date01 Aug, 2026
Cost
Document Cost10000.00
EMD80800.00
Estimated Cost8077901.00
Location
CityBalasore
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated materials away from work site with all leads and lifts and delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of machineries, labour cess etc. complete as per direction of the Engineer-in-Charge.2004.525One Cum
2Earth work excavation of foundation in slushy soil (in water upto 0.60m depth requiring the aid of pans and vessels) including dressing and leveling the bed and depositing the excavated soil clear of work site with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, Cess etc. complete in all respect as per direction and specification of the Engineer-in-Charge.220.974One Cum
3Providing C.C. M-15 and 40mm down graded black hard granite (crusher broken) stone chips of approved quality mixing by concrete mixure and placing manually, compacting with vibrator including hire and running charges of mixure, vibrator with cost, conveyance, royalty of all materials, labour charges and materials complete as per direction of the Engineer-in-Charge.70.191One Cum
4RCC work of M25 grade with 20mm down graded crusher broken black hard granite stone chips including cost, conveyance and royalty including watering and curing etc. complete as per direction of the Engineer-in-Charge.200.616One Cum
5Providing P.C.C. M-20 and 20mm down graded black hard granite (crusher broken) stone chips of approved quality mixing by concrete mixure and placing manually, compacting with vibrator including hire and running charges of mixure, vibrator with cost, conveyance, royalty of all materials, labour charges and materials complete as per direction of the Engineer-in-Charge.19.556One Cum
31st Jul, 2026

10 Days Left

WhatsApp