Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017239 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Bid 03-13 Of 2026-27 Construction Of Box Culvert (1x4.0x4.0) Over Occ Range Iv(b) Near Village Badagobara Foot Bridge. |
| Last Date For Submission | 31st Jul, 2026 |
| Opening Date | 01 Aug, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 67000.00 |
| Estimated Cost | 6695645.00 |
| City | Balasore |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantlling and removing Cement Concrete including stacking the useful materials for reuse and removing the debris with 50m lead etc. complete as per direction of Engineer-in-Charge. | 17.175 | One Cum |
| 2 | Earth work, loading, unloading and carriage by mechanical means of sand and sandy soil, including stoney earth, gravel and moorum etc. interspread with boulders upto 1/2cum size with all leads, lifts and delifts including trimming of bank slopes and bed to design section and depositing excavated materials away from the work site by mechanical means with an initial lead of 1.00Km, cess etc complete as per direction of the Engineer-in-Charge. | 2965.750 | One Cum |
| 3 | Filling foundation and plinth with clean river sand including well watered and rammed with all labour cost, conveyance, royalty and all taxes of materials etc. complete as per the direction of Engineer-in-charge. | 71.175 | One Cum |
| 4 | Providing C.C. M-15 and 40mm down graded black hard granite (crusher broken) stone chips of approved quality mixing by concrete mixure and placing manually, compacting with vibrator including hire and running charges of mixure, vibrator with cost, conveyance, royalty of all materials, labour charges and materials complete as per direction of the Engineer-in-Charge. | 91.600 | One Cum |
| 5 | RCC work of M25 grade with 20mm down graded crusher broken black hard granite stone chips including cost, conveyance and royalty including watering and curing etc. complete as per direction of the Engineer-in-Charge. | 220.460 | One Cum |
10 Days Left