| Tender ID | 3665023 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Corrigendum : Improvement Of Salt Road From Balasore To Gud From 0/000 Km To 1/000 Km And 13/000 Km To 16/000 Km In The District Of Balasore Under State Plan For The Year 2025-26. |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 463500.00 |
| Estimated Cost | 46343986.00 |
| City | Balasore |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 8000.000 | Sqm |
| 2 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 300.000 | Cum |
| 3 | Excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 3010.000 | Cum |
| 4 | Construction of embankment with materials deposited at site from roadway cutting and excavation from drain,Bridge and foundation of other structures graded and compacted to meet requirement of table 300-2. | 2408.000 | Cum |
| 5 | Construction of granular sub-base by providing Grading-VI Material as per table 400-2, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 300.000 | Cum |