Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5019483 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Rd Road To Sasanga School Chhaka To Mala Via Palaspur Road_road_pmc, Sealcoat In Stretches_0.500 To 1.774 |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 4000.00 |
|---|---|
| EMD | 5085.00 |
| Estimated Cost | 508473.00 |
| City | Balasore |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass & removal of rubbish upto a distance of 50m outside the periphery of the area etc. complete to shape as per direction of the Engineer-in-charge. | 518.000 | sqm |
| 2 | Flank dressing to proper camber including cost of labour ,T&P etc. complete as per direction of the Engineer-in-charge. | 400.000 | sqm |
| 3 | Scraping,cleaning the road surface,applying tack coat using 3.0Kg of bitumen for 10 Sqm & laying37.5mm thick built up spray grouting using 0.45 Cum of 25mm to 40mm size h.g.metal & 12Kg penetration grade of bitumen for 10 sqm with 0.12cum of 12mm size h.g.chips as key stone for 10 sqm,spreading over and laying heating,pouring and spreading bitumen over metal,chips & rolling with PRR including hire & running charges of PRR & all other machineries including cost of all materials,labour ,T&P ,royalty etc. complete as per direction of EIC. | 90.000 | sqm |
| 4 | Scraping,cleaning the road surface,applying tack coat using 3.0Kg of bitumen for 10 Sqm & laying75mm thick built up spray grouting in two layers 37.5mm thick each layer using 0.45 Cum of 25mm to 40mm size h.g.metal & 12Kg penetration grade of bitumen for 10 sqm in each layer with 0.12cum of 12mm size h.g.chips as key stone for 10 sqm,spreading over and laying heating,pouring and spreading bitumen over metal,chips & rolling with PRR including hire & running charges of PRR & all other machineries including cost of all materials,labour ,T&P ,royalty etc. complete as per direction of EIC. | 33.750 | sqm |
| 5 | Cleaning of existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous coarse including cost of all labour ,T&P etc. complete as per direction of EIC. | 847.500 | sqm |
8 Days Left