Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID5019483
Organisation NameRural Development Department
Tender BriefRd Road To Sasanga School Chhaka To Mala Via Palaspur Road_road_pmc, Sealcoat In Stretches_0.500 To 1.774
Last Date For Submission29th Jul, 2026
Opening Date30 Jul, 2026
Cost
Document Cost4000.00
EMD5085.00
Estimated Cost508473.00
Location
CityBalasore
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing grass & removal of rubbish upto a distance of 50m outside the periphery of the area etc. complete to shape as per direction of the Engineer-in-charge.518.000sqm
2Flank dressing to proper camber including cost of labour ,T&P etc. complete as per direction of the Engineer-in-charge.400.000sqm
3Scraping,cleaning the road surface,applying tack coat using 3.0Kg of bitumen for 10 Sqm & laying37.5mm thick built up spray grouting using 0.45 Cum of 25mm to 40mm size h.g.metal & 12Kg penetration grade of bitumen for 10 sqm with 0.12cum of 12mm size h.g.chips as key stone for 10 sqm,spreading over and laying heating,pouring and spreading bitumen over metal,chips & rolling with PRR including hire & running charges of PRR & all other machineries including cost of all materials,labour ,T&P ,royalty etc. complete as per direction of EIC.90.000sqm
4Scraping,cleaning the road surface,applying tack coat using 3.0Kg of bitumen for 10 Sqm & laying75mm thick built up spray grouting in two layers 37.5mm thick each layer using 0.45 Cum of 25mm to 40mm size h.g.metal & 12Kg penetration grade of bitumen for 10 sqm in each layer with 0.12cum of 12mm size h.g.chips as key stone for 10 sqm,spreading over and laying heating,pouring and spreading bitumen over metal,chips & rolling with PRR including hire & running charges of PRR & all other machineries including cost of all materials,labour ,T&P ,royalty etc. complete as per direction of EIC.33.750sqm
5Cleaning of existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous coarse including cost of all labour ,T&P etc. complete as per direction of EIC.847.500sqm