Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4166055 |
|---|---|
| Organisation Name | Department Of Local Bodies |
| Tender Brief | Corrigendum : Construction Of Public Reading Room Near Shree Vishawakarma Samaj Samiti At Vishawakarma Colony Balotra |
| Last Date For Submission | 14th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 22000.00 |
| Estimated Cost | 1100000.00 |
| City | Balotara |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 35.55 | cum |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). flooring pcc | 12.93 | cum |
| 3 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 33.40 | cum |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Step-1, step-2 | 9.44 | sqm |
| 5 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand), Ist Sort longitudinal, varanda foundation, Ist Sort lateral, 2nd sort longitudinal, varanda foundation, 2nd sort lateral, 3rd sort longitudinal, varanda foundation, 3rd sort lateral | 26.92 | cum |
Ending Today