| Tender ID | 4094328 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Corrigendum : Construction Of 40 Person Barrack And Vivechana Kaksh In Mahila Thana At District Balrampur (u.p.) |
| Last Date For Submission | 6th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 371000.00 |
| Estimated Cost | 18542000.00 |
| City | Balrampur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CIVIL WORK OF VIVECHANA KAKSH Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 56.530 | cum |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | 37.690 | cum |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 8km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 35.270 | cum |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 8.640 | cum |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the coloumn pitswall tench basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surrounding of pipes and conduits etc.complete(plinth area of the building at ground floor only shall be measured as per I.S.6313(Part ll 1981) aldrine emulsifiable concrete or any other approved material such as hepthachlor or chlordance will be used.The rate of application of chemical emulsion shall be as follows:- (1)treatment for masonary & foundation 5 litres per sq.m. (2)back fill in immediate contract with foundation 7.5 litre per sq.m (3)treatment of top surface of plinth filling 5 liters per sq.m. (4)treatment of soil along external parameter of building 7.50 lire per sqm. (For payment plinth area to be measured as per IS Code). | 62.040 | sqm |
3 Days Left