Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4095635 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Work Of Anganwadi Centre Building-1 In Durgapur Gram Panchayat Of Banda District |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 11 May, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 256000.00 |
| Estimated Cost | 2560000.00 |
| City | Banda |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning Jungle including uprooting of rank vegetation grass, bush, wood trees and saplings of girth upto 30 cm measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 100 metres outside the periphery of area cleared. | 185.80 | sqm |
| 2 | Earthwork Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. 2.6.1 All kinds of soil | 30.38 | Cum |
| 3 | Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) 300 mm dia piles | 99.00 | Rm |
| 4 | Pile Work (a) Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from the site of work and including watering, dressing etc. labour and T&P etc. required for proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a distance of 50 M. out side the periphery of area cleared. including cost of sand.. | 8.81 | Cum |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 39.83 | Cum |
6 Days Left