Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4828131 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Pcc Path Near H/o Mushtaq Ahmad Khan Towards H/o Imtiyaz Ahmad Bhat And Others At Ward No 10 Bandipora Ph-ii. |
| Last Date For Submission | 16th Jul, 2026 |
| Opening Date | 17 Jul, 2026 |
| Document Cost | 200.00 |
|---|---|
| EMD | 1200.00 |
| Estimated Cost | 60000.00 |
| City | Bandipora |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m or as per the directions of site engineer in -All kinds of soil. | 44.59 | Sqm |
| 2 | Earth work in excavation in all kinds of soil by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer | 1.01 | Cum |
| 3 | Supply and filling of dry stone soling in foundation trenches/under floors tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete | 3.11 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) incld. carriage of material from source to site of work complete | 3.11 | Cum |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 stone aggregate 40mm nominal size) including curing complete incld. carriage of material from source to site of work complete | 4.10 | Cum |
2 Days Left