Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4919859 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Widening/up Gradation Of Athwatoo Bunkote Sonarwani Road |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 5500.00 |
|---|---|
| EMD | 509000.00 |
| Estimated Cost | 25450000.00 |
| City | Bandipora |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | R-Wall :-Earth work in excavation in all kinds of soil by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer | 192.44 | Cum |
| 2 | Supply and filling of dry stone soling in foundation trenches/under floors tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete | 28.22 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) incld. carriage of material from source to site of work complete | 28.22 | Cum |
| 4 | Random Rubble masonry with hard stone in foundation and plinth using Quarry Stone including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) incld. carriage of material from source to site of work complete | 236.06 | Cum |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth using quarry stone with bond stone incld. carriage of material from source to site of work complete | 157.37 | Cum |
20 Days Left