Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3925234 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Restoration Of Aloosa Quilmuqam Road Package No. Jk03-wb01 Under Pmgsy Division Bandipora |
| Last Date For Submission | 11th Apr, 2026 |
| Opening Date | 11 Apr, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 91000.00 |
| Estimated Cost | 4547000.00 |
| City | Bandipora |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | R/B Walls:- Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 111.83 | Cum |
| 2 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 9.75 | Cum |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 105.24 | Cum |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth, including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 70.20 | Cum |
| 5 | POINTING ON STONE WORK Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) incl.cost and carriage of all materials from approved source to site of work with all leads, lifts, loading, unloading and octori.(Finished work to be measured, complete.) | 136.50 | Sqm |
6 Days Left