Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4525321 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Addition Alteration To Store Room Security Room Sentry Post P40 P19 And Rcma Building Provision Of Temporary Shelter Input Power Supply To Test Cell And Vertical Blinds At Gtre Cabs And Cemilac Under Ge I R And D East Bangalore |
| Last Date For Submission | 1st Jul, 2026 |
| Opening Date | 03 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98600.00 |
| Estimated Cost | 4930000.00 |
| City | Bangalore |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing RCC work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead all as per direction of Engineer- in-Charge. | 19.30 | CUBIC METRE |
| 2 | Demolishing cement concrete any description manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in -Charge. | 17.02 | CUBIC METRE |
| 3 | Demolishing brick work in cement mortar manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead all as per direction of Engineer- in-Charge. | 14.56 | CUBIC METRE |
| 4 | Material and labour for machine cutting of RCC beams (2 Nos) of approximate size 0.6m x 0.4m, length 12m and slab (1 No) of approximately size 12m x 4m, depth 150mm from the existing functional RCC structure without causing any structural deformation to existing functional structure at height upto 6m from ground level including cost of necessary scaffolding , machineries and labour all as per direction of Engineer- in-Charge. NOTE:- In case of any damage caused to existing functional structure, the same shall be repaired and made good and the rate quoted shall deemed to be inclusive of the same and no separate payment will be effective. | 1.00 | EACH JOB |
| 5 | Providing and fixing up to floor five level precast cement concrete solid block (1:1 :3) (1 cement : 1 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete all as per direction of Engineer- in-Charge. | 5.62 | CUBIC METRE |
6 Days Left