Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Department Of Atomic Energy
Tender ID4952816
Organisation NameDepartment Of Atomic Energy
Tender BriefCorrigendum : Annual Maintenance Contract For Minor And Petty Works At Ncbs For The Year-2026-2027.
Last Date For Submission7th Aug, 2026
Opening Date07 Aug, 2026
Cost
Document Cost0.00
EMD43870.00
Estimated Cost2193474.00
Location
CityBangalore
StateKarnataka

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work NOTES FOR EARTHWORK ITEMS: No working space shall be considered beyond the width of the foundation concrete (mud-mat) shown in the drawings. The contractor shall consider working space if required while quoting the rate. The quoted rate shall include the quantity of earthwork to be done for working space if required and also for re-filling the foundation. For payment, the measurement shall be restricted only to the foundation width shown in the drawings. No extra shall be permitted and measured for payment on account of working space / battering / benching for excavation and refilling around foundation. Earth work in excavation by mechanical means (hydraulic excavator) / manual means OVER AREAS (exceeding 30cm in depth, 1.50m width as well as 10sqm on plan) in ALL KINDS OF SOILS up to a depth not exceeding 1.50m including disposal of excavated earth, lead up to 50m and lift up to 1.50m etc., complete all as per specifications. (Disposed earth to be levelled by breaking clods if any and neatly dressed).3.00Cum
2Earthwork in excavation by mechanical means (hydraulic excavator) / manual means for FOUNDATION TRENCHES in ALL KINDS OF SOILS including dressing of sides, ramming of bottom, disposing the surplus excavated materials within a distance of 50m and lift 1.50m complete as per specifications. (Disposed soil to be levelled by breaking clods if any and neatly dressed).3.00Cum
3Extra for excavation over areas / foundation trenches in ALL KINDS OF SOILS for each additional depth of 1.5m or Part thereof over initial depth of 1.5m.3.00Cum
4Filling available excavated approved earth (excluding rock) in trenches, sides of foundations, plinth, etc; in layers not exceeding 20cms depth breaking clods, consolidating each deposited layer by ramming, watering and dressing, etc; complete for lead upto 50m and all lifts etc., complete as per specifications.3.00Cum
5Earth work in surface excavation in all kinds of soils not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10sqm on plan inclusing getting out and disposal of excavated earth upto 50 m and lift upto 1.5, as direct by Engineer-in-charge: (disposed soil to be levelled and neatly dressed complete as per specifications.)20.00Sqm
7th Aug, 2026

3 Days Left

WhatsApp