Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4754827
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repairs Replacement Of Sub Main Wiring Point Wiring Switches Sockets Fittings And Fixtures Repairs To Ceiling Exhaust Wall Mounted Fans At Cabs Stir And Cemilac Under Ge I R And D East Bangalore
Last Date For Submission21st Jul, 2026
Opening Date23 Jul, 2026
Cost
Document Cost500.00
EMD98000.00
Estimated Cost4900000.00
Location
CityBangalore
StateKarnataka

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking down carefully unserviceable aluminium / copper point wiring (light, fan, socket or power) with fittings such as switches, sockets, ceiling rose, light fittings etc, removing all material for reuse / issued under Schedule of Credit and making good the disturbed surface as the existing one, complete all as specified and as directed.457.00POINT
2Material and labour for point wiring complete with multi stranded copper conductor size 1.5 sq.mm PVC insulated, unsheathed, FRLS cable, 1100 volts grade conforming to IS 694 multi stranded , drawn in casing and caping fixed on wals / floors / ceiling etc with and including metal flush boxes of suitable size and modular white plate with frame for mounting of fittings, modular type switches, regulator and also including 1.5 sq.mm PVC insulated unsheathed copper cable green in colour as continuous earth continuity conductor and connecting to earth dolly, cutting chassis to the walls / floors / ceiling for one light / fan / exhaust fan point controlled by one way switch and repairing with existing surface after work complete all as specified and as directed by Engineer-in-Charge. 250.00POINT
3All as per Ser item No 2.00 above but one three pin socket outlet 6 amps socket on the same board with other switches complete all as specified and as directed by Engineer-in-Charge.25.00POINT
4All as per Ser item No 2.00 above but one 3 pin socket point 6 Amps on the independent board with other switches complete all as specified and as directed by Engineer-in-Charge.100.00POINT
5All as per Ser item No 2.00 above but one bell point controlled by one bell push complete all as specified and as directed by Engineer-in-Charge.2.00POINT
21st Jul, 2026

6 Days Left

WhatsApp