Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4812074 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Permanent Restoration Of Hingni Chakka Road By Way Of Construction Of R/wall In Km 2nd Rd 50-100 Rd 500-600 Under Ut Capex Road Sector Of Capex Budget |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1000000.00 |
| City | Banihal |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of Soil | 75.41 | cum |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock | 32.32 | cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 9.69 | cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 23.25 | cum |
| 5 | Providing and laying cement concrete in retaining walls, return walls (any thickness) including attached pilasters , columns , piers , posts, struts butteresses , string or laces , courses , parapets , coping , bed blocks , anchorblocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring , shuttering and finishing with in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 27.56 | cum |
11 Days Left