Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3888822 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Bdo Bnk1/ 34/wbla 2026/ 2025 2026 Dated 30.03.2026 Sl 01 |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 09 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6000.00 |
| Estimated Cost | 0.00 |
| City | Bankura |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Mobilisation and transportion of the Rig machineand its accessories and others materials, etc. to the site | 1 | No |
| 2 | Drilling a bore hole in DTH process through any kind of soil and rocks in over burden suitable for lowering and fitting fixing of 200mm internal dia casing pipe (casing pipe will be supplied by deparmentally) upto and average depth of 25 5mtrs. and subsicuently 165mm dia mtr. boring through any kind of rocy formation upto a total depth of 170mtrs (for dry drilling or sufficient water not achived, drilling may be continued upto 200mtr.) including all other works necessary for boring and lowering fitting fixing of MSERW / UPVC casing pipes suitable for 165mm dia drilling in rockbed and groughting the same as per direction of the EIC. including (in case of MSERW casing pipes) the cost of weilding of MSERW casing pipes and weilding the top of the casing pipe with one 8mm thick MS cover plate (with supply and delivery of the plate). Necessary arrangement to be made for proper security of bore hole. (Rates are inclusive of all materials necessary for drilling works). Note:- a) MSERW / UPVC casing pipes should be properly inserted or lowered in overburden zone for proper RBTW formation. b) In case of collapse in borehole. payment will be done for clear measurable depth only. a). 0 to 25 mtr | 30 | Mtr |
| 3 | b). 25 mtr to 170 mtrs or above | 225 | Mtr |
| 4 | Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and pl | 1 | Day |
| 5 | Supply and delivery of UPVC pipe (CD) conforming to IS 12818:2010. c) 125 mm dia. | 30 | Mtr |
6 Days Left