Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Development Directorate
Tender ID4442389
Organisation NameWater Resources Development Directorate
Tender BriefNew-excavation Of Kalipahari Hapa - 3 At Mouza -kalipahari, J.l. No - 3, Plot No. - 50 , Gp-hatgram, Block - Indpur, Dist - Bankura Under The Executive Engineer (ai), Bankura (ai) Division Under Matir Shristi Programme
Last Date For Submission15th Jun, 2026
Opening Date17 Jun, 2026
Cost
Document Cost0.00
EMD21611.00
Estimated Cost1080529.00
Location
CityBankura
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.2040.000Sqm
2Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and postwork)3370.690Cum
3Excavation in gravel / moorum / kankar / compact moorum /very much weathered rock / sticky soil mixed with moorum or ghooting for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and postwork)2696.550Cum
4Excavation in soft weather rock / solt laterite rocks for WDS / WHS/RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work)674.140Cum
5Fine dressing the sub-grade slope / flank etc. to proper profile including cutting and removing spoils where necessary.1600.000Sqm
15th Jun, 2026

15 Days Left

WhatsApp