Tender ID4174009
Organisation NameWater Resources Department
Tender BriefCorrigendum : Construction Of Khodavelaanicut On Jakham River Village Khodavela Gp Bharkundi Tehsil Dhariyawad District Pratapgarh
Last Date For Submission27th May, 2026
Opening Date29 May, 2026
Cost
Document Cost10000.00
EMD2931160.00
Estimated Cost146557950.00
Location
CityBanswara
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil4344.23Cum
2Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum8688.45Cum
3Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. 651.63Cum
4Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite & other hard rock requiring nominal blasting Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. 1303.27Cum
5Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. 2715.14Cum