| Tender ID | 3928893 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Rectification Of Blackspots On Banswara Udaipur Road (sh-32) At Munger In Dn. Beneshwar Dham H.q. Aspur |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 113000.00 |
| Estimated Cost | 5650000.00 |
| City | Banswara |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Part "A" Earth Work Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | 0.28 | Hec. |
| 2 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305).By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 320.50 | Cum |
| 3 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 4271.12 | Cum |
| 4 | Construction of embankment with approved Materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 tonne to meet requirement of Tale 300-2 as per MoRTH specification : Clause No. 305 | 320.50 | Cum |
| 5 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 1089.00 | Cum |