Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4074543 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Remaining Work Of Construction Of Atal Pragati Path At Talwara Village (talwara Tripura Sundari Road Km. 0/0 To 2/300 Mdr-338) |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 416240.00 |
| Estimated Cost | 20812000.00 |
| City | Banswara |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART "A" C.C. Work Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 452.33 | Cum |
| 2 | Earthwork in excavation in ordinary rock, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 13.80 | Cum |
| 3 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 3220.22 | Cum |
| 4 | Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses | 34.49 | Cum |
| 5 | Providing and laying granular sub-base Material having P.I. not more than 6, including spreading in layers not exceeding 150mm compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve 100% proctor density to required camber & grade including cost of water & hire charges of machinery, including T&P with all leads. (Compacted thickness to be measured). (c) Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 20. | 456.58 | Cum |
3 Days Left