Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5025529 |
|---|---|
| Organisation Name | Rural Development And Panchayati Raj Department |
| Tender Brief | Construction Of Library At Hadipora Under 14th Fca Block Rohama District Baramulla |
| Last Date For Submission | 12th Aug, 2026 |
| Opening Date | 13 Aug, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 389080.00 |
| Estimated Cost | 19454000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres (All kinds of soil) | 476.765 | Cum |
| 2 | Providing and laying of stone solling hand Packed including all Carriages | 40.682 | Cum |
| 3 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including curing but excluding cost of centering shuttering, finishing and reinforcement. | 21.358 | Cum |
| 4 | Providing and laying of Rainfored Cement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:1.5:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) including curing but excluding cost of centering shuttering, finishing and reinforcement. | 136.573 | Cum |
| 5 | Reinforced cement concrete work in walls including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments etc with 1:1.5:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 29.616 | Cum |
22 Days Left