Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3934519 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Annual Stage Contract For Routine, Breakdown Maintenance Of Mgps Works At Associated Hospital Gmc Baramulla For A Period Of One Year (2025-26) |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 200.00 |
|---|---|
| EMD | 4960.00 |
| Estimated Cost | 248000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Replacement of damaged outlet points/inlet points/double lock outlets including respective adaptors for (O2, CO2, N2O, Medical air & Vaccum) which shall be of HTM 0201 BS standard, manufactured with a 165 mm length, copper inlet pipe stub which is silver brazed to the outlet body. Body shall be of one-piece brass construction. For positive pressure gas services, the outlet shall be equipped with a primary and secondary check valve and the secondary check valve shall have break safe mechanism and also comply to EN 737 pressure test standards and rated at minimum 200 psi in the event the primary check valve is removed for maintenance. The outlet assembly should have separate colour coding for each services and will accept only corresponding gas specific adaptors. All outlets shall be cleaned and degreased for medical gas service, factory assembled, tested and to be fitted inside existing pendents and bed head panels as a replacement against damaged ones. | 1.000 | Job |
| 2 | Replacement of damaged Back pressure compensated (BPC) Flow meter with humidifier bottle along with probes/connectors having control within range of (0-15) LPM (calibration within +/- 10%). It should meet strict precision and standard durability. The flow tube and shroud components should be made of clear, impact resistant polycarbonate and humidifier bottles should be made of unbreakable polycarbonate material and to be fitted inside existing pendents and bed head panels as a replacement against damaged ones. | 1.000 | Job |
| 3 | Replacement of damaged 600 ml ward vaccum unit. The unit should consist of a regulator, reusable collection jar made of unbreakable polycarbonate material and fully auto clavable at 134 degree centigrade, a wall bracket for mounting the jar assembly on the wall. The vaccum regulator shall be adjustable and have vaccum gauge which indicates suction supplied by the regulator. Safety trap shall be provided inside the jar to safeguard the regulator from overflowing. | 1.000 | Job |
| 4 | Replacement of damaged 2000 ml Theatre vaccum unit. The unit should consist of a regulator, reusable collection jar made of unbreakable polycarbonate material and fully auto clavable at 134 degree centigrade, a wall bracket for mounting the jar assembly on the wall. The vaccum regulator shall be adjustable and have vaccum gauge which indicates suction supplied by the regulator. Safety trap shall be provided inside the jar to safeguard the regulator from overflowing. | 1.000 | Job |
| 5 | Replacement of damaged isolation valves. The isolation valves should be non lubricated, 90 (degree) turn level, ball type suitable for gaseous service. All valves shall be Pneumatically tested for twice the working pressure and factory degreased for medical gas service before supply. |
5 Days Left