Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4133951
Organisation NamePublic Works Department
Tender BriefCorrigendum : Annual Stage Contract For The Work Maintenance Of Roads And Bridges P L Of Rcc Pipes Clearance Of Drains Repair Renovation Of Drain R Walls, Slip Clearance Under The Jurisdiction Of Rnb Sub Division Gurez And Rnb Sub Division Bagtore Part-1
Last Date For Submission8th May, 2026
Opening Date09 May, 2026
Cost
Document Cost600.00
EMD20000.00
Estimated Cost1000000.00
Location
CityBaramulla
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by manual means in trenches for oundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils.1.00Cum
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil.1.00Cum
3Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in all kinds of soil as directed by Engineer-in-Charge.1.00Cum
4Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete1.00Cum
5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.1.00Cum
8th May, 2026

3 Days Left

WhatsApp