Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4099860 |
|---|---|
| Organisation Name | Rural Development And Panchayati Raj Department |
| Tender Brief | Corrigendum : Construction Of Pumpshed Khul Passing Through The Land Of Gh Nabi Ganie Upto Land Of Bashir Ahmad Mir At Adipora, Block Sopore, Under Cdf, Fy 2026-27 |
| Last Date For Submission | 15th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 23900.00 |
| Estimated Cost | 1195000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 70.500 | cum |
| 2 | Providing /laying of stone soling handpacked under floors and foundation trenches including dressing, watering, compacting incl. plum and all carriage up to site of work complete job | 17.440 | cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete. | 13.210 | cum |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 462.820 | sqm |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete | 60.220 | cum |
19 Days Left