Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4924520 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction/upgradation Of Link Road From Masjid Qadeem Yarwan To Hajam Mohalla Pehlipora |
| Last Date For Submission | 23rd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 25380.00 |
| Estimated Cost | 1269000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 283.500 | Cum |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | 1.000 | No |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 27.660 | cum |
| 4 | Providing ,laying, fiiling, stacking of RBM/GSB/Nallah Muck/Quarry Muck including spreading , leveling, dressing and then consolidating with PRR 8-10 Tonne capacity complete job | 27.380 | cum |
| 5 | Laying, spreading and compacting stone aggregate of sizes 63mm to 45mm (WBM G-II) in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. including all cost and carriage complete job as per directions of Engineer Incharge at site | 13.690 | cum |
1 Days Left