Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4898185 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Permanent Restoration Of Road From L035 Fruit Mandi To Block Boundary_package No. Jk03 2012 |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 18 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1000000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Crash Barrier | ||
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 22.72 | cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) M-15 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 22.72 | cum |
| 4 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 200.00 | Rm |
Ending Today