Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4034325 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Corrigendum : Rewinding Of 10 Hp, 04-pole, 03-phase Squirrel Cage Induction Motor At Lift Irrigation Schemes Sultanpora Of Misd Handwara. |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 50.00 |
|---|---|
| EMD | 314.00 |
| Estimated Cost | 0.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Disconnecting of all motor leads, dismantling of motor, taking out the rotor from the stator and complete disassembly as per requirement of job. | 1.00 | Job |
| 2 | Mechanical transportation, loading, unloading, and handling of various items of induction motor to workshop, in a load carrier auto, mini-van or similar approximately 35 km on an average. | 2.00 | Trip |
| 3 | Complete rewinding of stator coils of 3-phase motor by providing and fitting of finished new electrolytic grade copper windings with insulation in place of damaged windings including allied costs such as varnishing and labour, drying etc per Kg of winding approximately | 6.00 | Kg |
| 4 | Providing and fitting of ball bearings no 6308 with adequate greasing | 2.00 | No. |
| 5 | Assembling of all motor and re installation at site after carrying out necessary repairs using tools and tackles and testing on full load. | 1.00 | Job |
3 Days Left