| Tender ID | 5019740 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Improvement/upgradation Of School Building At Ms Trumbgund, Zone Sopore |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 200.00 |
|---|---|
| EMD | 7780.00 |
| Estimated Cost | 389000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of G.S. Sheet | 101.49 | Sqm |
| 2 | Providing hoisting and fixing trusses/purlins/ rafters/posts/post- plates, false ceiling , Partitions etc. Sawn and fixed in poisition or like components including cost of screws etc. complete First class Poplar wood including all carriages. | 1.33 | Cum |
| 3 | Providing & fixing colour coated (Hi-Rib) G.I sheet roofing 0.50mm thick incl. vertical/curved surface fixed with polymer coated J or L hooks bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I limpet washer and over lapping of sheets complete in horizontal vertical trusses incl. cutting to size and shape wherever required including Ridges or Hips of 60 cm overall width colour coated sheets 0.50mm thick and valleys of 90 cm width colour coated sheets 0.50mm thick etc complete as per the directions of Incharge Engineer. including all carriages. | 108.74 | Cum |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 7.65 | Cum |
| 5 | Supply and filling of dry stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete | 0.99 | Cum |