| Tender ID | 5025984 |
|---|---|
| Organisation Name | Power Development Department |
| Tender Brief | Rm Shifting Of 100 Kva Distribution Transformer At Ganiwani Under Ut Capex Budget 2026-27 |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 11 Aug, 2026 |
| Document Cost | 130.00 |
|---|---|
| EMD | 3280.00 |
| Estimated Cost | 164000.00 |
| City | Baramulla |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) | 2 | No. |
| 2 | Supply, Transportation and errection of 8MTR long ST Poles (410-SP 15) completely erected in the pit of 1/6th of the pole length including excavation and back filling of the pole pit . (as per REC standard) | 1 | No. |
| 3 | Supply and fixing of 120mm single core Cable,1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type | 40 | Mtr |
| 4 | Earthing of kVA SubStation--Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 75 mm x10 mm & 50 mm x 6 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover | 3 | No. |
| 5 | Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers) | 280 | Kgs |