| Tender ID | 3993646 |
|---|---|
| Organisation Name | Rajasthan Rajya Vidyut Prasaran Nigam Limited |
| Tender Brief | Additional Work For Modification Of Existing 132kv D/c Transmission Line From 132kv Gss Rvpn, Baran To Baran Tss 2-phase Into 3- Phase Under Deposit Work Of Railway |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 2950.00 |
|---|---|
| EMD | 79310.00 |
| Estimated Cost | 3965215.00 |
| City | Baran |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Details Survey as per tentative route Which includes the following majar activities- Pegging of line route, providing of servey pillar at an interval of 3-4 Km in the line route with required jungle clearance for survey, Profile preparation of approved route on graph sheet and marking of offset on eighter side of line, marking of side clearance for hills, sand dunes etc. as per specification and tower scheduling. | 0.300 | Km. |
| 2 | Check survey as per approved route of line which includes - Rechecking of the line route as per approved profil. Chainage tower centre marking, pit marking bisection of angle tower as requrred at site. | 0.300 | Km. |
| 3 | Excavation Excavation excluding back filling, including shoring, shuttering, dewatering etc. uptothe required depath as per foundation specification / drawing. (i) Any Soil, soft rock other than hard rock | 1061.000 | Cum. |
| 4 | Setting of Template & Stub / Anchor Bolt Setting of template & stub / Anchor bolt & removal after concreting excluding cost of excavation and concretingbut including back filling with excavated / borrowed earth (with lead & lift) in layers withramming and watering as per specification (i) Towers including extension upto 9Meters | 1.000 | MT |
| 5 | Concreting Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand stone aggregate 20 mm nominal size, water etc. preparing surface, shuttering mixing, placing, ramming, curing, finishing as per specification and drawing. (ii) 1:3:6 Mix | 25.000 | Cum. |