Tendering Authority: Public Works Department
Tender ID4651845
Organisation NamePublic Works Department
Tender BriefCorrigendum : Annual Repair To Sandari Via Pathari Km. 7/800
Last Date For Submission3rd Jul, 2026
Opening Date06 Jul, 2026
Cost
Document Cost500.00
EMD36000.00
Estimated Cost1800000.00
Location
CityBaran
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.soil108.000Cum
2Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:688.350Cum
3Providing and laying stone set pavement on prepared surface with sub-base 100 mm thick compacted Granular Sub-base as per Clause 401.3 and base 75 mm thick compacted water bound macadam grading 1 as per Clause 404.3. The 150 mm thick hammer dressed stones are laid in the herringbone or stretcher bond pattern. The stones are compacted into the bedding sand of 40 mm over the WBM base bounded by edge stone using suitable compacting device. The gaps are filled with fine sand stone dust as per MoRTH Specification Clause 408.30.000Cum
4Backfilling behind abutment, wing wall and return wall complete as per drawings & MoRTH specification Clause 304.3.7 & 2204.6 Granular material68.850Cum
5Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means with a lead of 1 Km.88.200Cum