Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Village Panchayat
Tender ID4781556
Organisation NameVillage Panchayat
Tender BriefCorrigendum : Beautification Of Pond At Moicawaddo In Ward No. Ii In Village Panchayat Pilerne-marra Bardez-goa.
Last Date For Submission17th Jul, 2026
Opening Date21 Jul, 2026
Cost
Document Cost5000.00
EMD25659.00
Estimated Cost1282936.00
Location
CityBardez
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation over areas in saturated soil (exceeding 0.30 m upto a depth of 0.60 m) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be neatly dressed and leveled including pumping or bailing out water133.76Cu.m
2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.16.72Cu.m
3Providing and laying in position cement concrete 1:3:6 (1 cement : 3 coarse sand: 6 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level8.36Cu.m
4Providing and laying in position machine batched concrete (BMC), machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete work including pumping of concrete to the site of laying but excluding the cost of centering , shuttering, finishing and reinforcement including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workability without impairing the strength and durability as per the direction of the Engineer-in-charge. M25 grade of reinforced cement conrete by using 410kg of cement per cu.m. of concrete. All works upto floor V level.51.30Cu.m
5Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.4617.00Kgs
17th Jul, 2026

6 Days Left

WhatsApp