Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Goa Tourism Development Corporation Limited
Tender ID4638314
Organisation NameGoa Tourism Development Corporation Limited
Tender BriefCorrigendum : Upgradation/beautification Of Shri Devi Kalika Temple At Oxel-siolim Bardez Taluka Goa
Last Date For Submission3rd Jul, 2026
Opening Date04 Jul, 2026
Cost
Document Cost8000.00
EMD361342.00
Estimated Cost18067057.00
Location
CityBardez
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation over areas by mechanical/mannual means at all depths in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including dressing of sides and ramming of bottoms, including getting out the excavated soil at all lifts, including pumping or bailing out water as directed by the Engineer on site including segregating the excavated earth along with crushed rock pieces of size 75mm and below and disposal of surplus excavated earth as directed by Engineer within a lead of 50mt and all lift and including breaking of excavated rock into boulders of size ranging from 150mm to 300 mm and stacking the broken boulders at a place specified by the Engineer on site etc. complete481.00cu.m
2Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.222.00cu.m
3Disposal of unserviceable material such as buiding rubbish,wood,earth excavated rock etc for all leads and lifts beyond 50m259.00cu.m
4Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.283.00cu.m
5Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.36.00cu.m
3rd Jul, 2026

2 Days Left

WhatsApp