Tender BriefCorrigendum : Provision Of Concertina Fencing Over The Boundary Wall Extending From Piyala Gate To The Wet Ash Disposal Lines, Including A Part Chain-link Fencing.job No. 961 /dpps.
Last Date For Submission8th Jun, 2026
Opening Date10 Jun, 2026
Cost
Document Cost0.00
EMD47900.00
Estimated Cost0.00
Location
CityBardhaman
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Supplying fitting and fixing 600 mm ( 30mm) dia. meter R.B.T (Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx. 6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.) (The rate is exclusive of the cost of posts).1870.00Mtr.
2M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rates includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc. II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m. [M.S structural member to be supplied by the agency].14.80MT
3Labour for taking out (from fencing) line of wire (galvanised, strand or barbed) including the cost of taking out staples (by cutting or otherwise, as necessary). (Payment to be made on the length of the wire taken out). 4800.00Mtr.
4Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directed within a lead of 75m. Including stacking of steel bars. (a) In ground floor including roof. 9.66Cum
5Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. 9.71Mtr.