Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Municipal Corporation
Tender ID4080277
Organisation NameMunicipal Corporation
Tender BriefConstruction Of Platform For Installation Of Horse Statue Near Satyaprakash Park In Ward-47, World Globe With Child And Man And Basket Statue At 02 Other Places.
Last Date For Submission30th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost826.00
EMD14986.00
Estimated Cost749300.00
Location
CityBareilly
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.0.88Cum
2Excavation in foundation in ordinary soil foul requiring the use of special T&P such as pickaxe, subbles etc. (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. (Excluding Royalty)( S.I. No.251)8.28Cum
3Earth work in cutting or embankment in ordinary soil to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty)19.92Cum
4Providing and layingConcrete with 4cm gauge brick ballast, fine sand of 1.25 fineness modulous and cement in prportion of 1:6:12 in foundation in under floor , including supply of all material labour and T&P etc rfequired of proper completetion of the work .5.52Cum
5RCC 1:1.50:3 with cement c'sand stone grit of 20 mm gauge in Slabs excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work.14.86Cum
30th Apr, 2026

6 Days Left

WhatsApp