Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4313991 |
|---|---|
| Organisation Name | Bareilly Development Authority |
| Tender Brief | Corrigendum : Greater Bareilly Awasiye Yojna Ke Sec-8 Me Aantrik Vikas Karyo Ke Antargat Sewerline, Waterline, Park, Boundary Wall, Electric Trench Avam Sadak Ka Nirman Karye. |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 01 Jul, 2026 |
| Document Cost | 30000.00 |
|---|---|
| EMD | 2344500.00 |
| Estimated Cost | 117220686.00 |
| City | Bareilly |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. including royality. P.W.D. SOR 2025 Item No. 251 | 5668.61 | Cum |
| 2 | Add to items (251 to 253 for every additional 30m. lead or part of 3.0m. Or for every additional 1.5m. Lift or part of 1.5m. | 149.94 | Cum |
| 3 | Earth work in filling in ordinary soil including leveling dressing and ramming and also including cartage 4.00 Km distance Including loading unloading cost of earth royalty etc. all complete as per direction of E/I Excluding royality PWD SOR 2025 ITEM No. 253+ cartage+ cost of earth etc | 72808.10 | Cum |
| 4 | Extra for machenical compaction of Earth including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete. PS | 16260.39 | Cum |
| 5 | Construction of granular sub base (G.S.B.) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, compete at per clause 401. (Analysis Rate) | 1875.99 | Cum |
13 Days Left