Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Jal Nigam
Tender ID4321928
Organisation NameUttar Pradesh Jal Nigam
Tender BriefCorrigendum : Investigation Survey Construction Of 300,400,700kld Stp At Np Saidpur Dist Budaun
Last Date For Submission30th Jun, 2026
Opening Date30 Jun, 2026
Cost
Document Cost11800.00
EMD449000.00
Estimated Cost22425281.00
Location
CityBareilly
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP- 300 KLD with Coarse Screen Chamber With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.1Job
2Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP- 400 KLD with Coarse Screen Chamber With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.1Job
3Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP- 700 KLD with Coarse Screen Chamber With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.1Job
4Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Leach Pit With Silt Chamber [10 KLD] on proven technology for Preliminary Treatment of waste water with proper arrangement of carry of waste water by U-PVC pipes from houses to leach pit with proper arrengement of sludge and residue from the leach pit, for desired number of houses as per the instructions of Engineer in charge. Leach pit must be follow the instructions of CPHEEO Mannual , NGT Norms &SBM-2.0 Guidelines. Treated effluent should fulfill parameters as per NGT Norms .13.00Nos
5Survey, Investigation, Design, Construction of Interception Drain with Rcc cover in 1st class brick work with cement sand mortor (1:4), including plastring(1:4) cement sand which size not less than (0.9X1.0)m with proper gradient towards proposed STP and leach pit, for proper sewage reached at stp and leach pit including all labours material T&P complete as per direction of engineer incharge.2170.00m
30th Jun, 2026

14 Days Left

WhatsApp