Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3882467 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Cooling Towers For Certain Central Ac Plants Installed At Af Stn Bareilly |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 88000.00 |
| Estimated Cost | 4400000.00 |
| City | Bareilly |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 70 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 2.00 | Each Job |
| 2 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 125 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 3 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 60 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 4 | Supply fixing installation and testing complete a new Cooling Tower of Capacity 50 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 5 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 90 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. Note FOR Item 1 to 5 : (i) Rates are inclusive of all minor/Major parts complete set of Cooling Tower. (ii) Size and capacity of Cooling Tower will be as per mentioned above (iii) LPS/PVC Fills rates are included in quoted rates. (iv) Tie Rod/Turn Buckle SS/Eliminators/Fan Assembly with motor etc complete set with all connected items. | 1.00 | Each Job |
9 Days Left