Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4563787 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance Of Non Clog Sewage Pumps Of Various Capacity , Chemical And Bacterial Tests Of Water And Connected Items At Afs Bareilly Under Ge (af) Bareilly |
| Last Date For Submission | 7th Jul, 2026 |
| Opening Date | 09 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1000000.00 |
| City | Bareilly |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for taking out defective sewage pumping set centrifugal type of any make of 25 HP capacity by dismantling from suction and discharge pipe line and existing motor shaft, transporting to civil work shop for cleaning, scraping, painting, machine repair work and necessary overhauling, replacement of worn out and defective part including machining, threading, tapping all as required to bring the pump in perfect working condition and transporting back the same to its original location, re-assembling, installation, commissioning and testing complete all as specified and directed. Note: (a) The defective / worn out spare parts shall be measured and paid separately under relevant items as supply only. (b) The rewinding of motor shall be measured and paid separately under relevant items. | 2.00 | Each |
| 2 | M&L for rewinding of defective squirrel cage induction motor set with super enameled copper wire of same gauge as per existing of any make of capacity 25 HP by dismantling from existing pump set and disconnecting from electric panel and transporting the same to civil workshop including dismantling, checking, removal of burnt out winding including re-assembling, installation, commissioning and testing complete all as specified and directed. | 2.00 | Each |
| 3 | Supply only in replacement of pump shaft MS suitable for 25 HP centrifugal pump set complete all as specified. | 1.00 | Each |
| 4 | Supply only in replacement of Guide spinder complete with bush suitable for 25 HP centrifugal pump set complete all as specified. | 1.00 | Each |
| 5 | Supply only in replacement of Gland bush suitable for 25 HP centrifugal pump set complete all as specified. | 2.00 | Each |
6 Days Left