Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4857740 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | In Ward 28, Faridapur Chaudhary, Construction Of A Drain And Cc Interlocking Tile Road From Mohammad Nayi To Shahabuddins House And From Salims House To Syed Sahebs House. |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 16878.00 |
| Estimated Cost | 843882.00 |
| City | Bareilly |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply of earth for filling or embankment in ordinary soil earth work in filling or embankment to bein 20cm layers including waterig,Dressing compacting ,ramming the soil to achive 95% proctor dencity and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead. The earth from cutting to be used in makin embankment or to be deposited as spoil banks withn 30m distance as directed by the Engineer-in-charge. | 191.10 | CUM |
| 2 | Providing and laying concrete with 4cm gauge brick ballast,fine sand of 1.25 fineness modlous and cement in prportion of 1:6:12 in foudation in under floor ,including supply of all material labour an T&P etc rfequired of proper completetion of the work. | 12.185 | CUM |
| 3 | First class brick work in 1:4 cement and fine sand of 1.25 FM. Mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 31.209 | SQM |
| 4 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. | 1.200 | CUM |
| 5 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 0.942 | QTL |
6 Days Left