Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5926259 |
|---|---|
| Organisation Name | Modern Coach Factory |
| Tender Brief | Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake As Per Drawing No: (1) Aaa-1-0-488, Alt. 'c', 2 Nos (rain Water Gutter) (2) 2 11012.0.20.110.100, Alt. 'nil', 2 Nos (rain Water Gutter) (3) Lp10107, Alt. 'nil', 2 Nos. (sheeting) (4) Lp10136, Alt. 'd' Anx-4, 1 No. (including 538-1-0-070, Alt 'a' Sub Drawing Of 1 11012.0.20.095.037, Alt. 'c' Anx-1 And Lp10135 Anx-13) (5) Lp10125 Alt. 'b' Anx-13, Item-33, 14 Nos. (ledge) (6) Lp10108, Alt. 'a' Anx-1, 8 Nos.(duct Assembly) (7) Aaa-1-0-278, Alt. 'nil', 4 Nos. (hand Hold Arrangement) (8) 1.11012.0.03.095.001 Alt. 'a', 1 No (including 538-1-0-035, Alt. 'c' Sub Drawing Of 1.11012.0.03.095.002, Alt. 'a' Anx-3) Note : Drawing Number: Aaa51072 To Be Read As Mvmc15013 Alt. 'nil' The Above Items To Be Supplied As Set And To Be Installed At The Body Shell Assembly Stage To Assembly Drawing Number: Lp10125, Alt. 'b' Anx-13. Special Condition: A) Installation Required & Annexure-a, Dated: 13-09-2023 To Be Followed. B) Supplyrate And Installation Rate To Be Quoted Separately. C) The Firms Should Use Only Gtaw (or) Gmaw Welding Process For Installation Works. Mmaw (manual Metal Annual Rate Contract Welding) Is Not Permitted. Packing Instruction: (rcf Pi 042 Ver 1.0 ) [ Warranty Period: 96 Months After The Date Of Delivery ] |
| Last Date For Submission | 23rd Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | BARELI |
|---|---|
| State | Madhya Pradesh |
18 Days Left