| Tender ID | 3991097 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Improvement To Adgaon Minor From Rd 823m To 1050m. |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 13000.00 |
| Estimated Cost | 1272876.00 |
| City | Bargarh |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork exavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge per the direction of Engineer-in-charge. | 99.150 | per cum |
| 2 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc. complete, as per direction of Engineer-in-Charge. | 23.400 | Per cum |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including 3 hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 19.650 | Per cum |
| 4 | Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips for C.C & R.C.C. work. including cost, conveyance, royalty & other taxes of all materials to the work site, mixing & laying of concrete in position & compacted properly with all leads lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction & curing etc. complete as directed by Engineer in-charge | 105.300 | per cum |
| 5 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads, lifts, sundries including cost, conveyance labour T&P etc. complete as directed by Engineer-in-charge | 486.000 | per sqm |